Automatic Packaging Machine

QS Fully Automatic Cantilever Pallet Wrapping Machine

A cantilever wrapper that rotates around the load, so pallets stay still and never shift

QS Fully Automatic Cantilever Pallet Wrapping Machine | CEMBRIQ
QUICK ANSWER

The QS cantilever wrapping machine seals whole pallet loads in stretch film at the end of a building materials line. Its base is fixed and the cantilever arm rotates around the pallet, so the load never turns and its centre of gravity never shifts. Tall stacks of aerated concrete blocks, cement bricks, gypsum blocks and other wall materials can be wrapped without the risk of toppling or scattering. A PLC with a touch screen runs film feeding, film cutting, wrapping and the start and stop sequence. Wrapping layers, lifting stroke and film tension are all adjustable to match pallet height, length and width, and a pre-stretch mechanism raises film utilisation while lowering consumable cost. The closed wrap protects products from dust, moisture and rain. The footprint is small and the frame tolerates dust and heavy duty use, which suits the continuous, dusty environment of a block factory. The unit can work alone or join a palletizing line so that stacking, wrapping and dispatch run as one automatic flow. It fits both new plants and upgrades of existing halls.

MACHINE SELECTION

Configured around output, blocks and operating conditions.

Fixed base with a rotating cantilever, so the pallet never turns and the load keeps its balance, PLC and touch screen control with automatic film feeding, wrapping and cutting plus one-touch start, Adjustable wrapping layers, lifting stroke and film tension for any pallet size, Built-in film pre-stretch that raises film utilisation and lowers consumable cost, Sealed wrap against dust, moisture, rain, scattering and collapse during road transport, Compact footprint that tolerates dust and heavy continuous duty, for standalone or in-line use

Typical decision factors

AutomationConfigured by project scope
ProductsWrapping palletised aerated concrete blocks, cement bricks and gypsum blocks before dispatch, Packing wall materials and other square palletised goods in building material factories, Standalone wrapping at the end of a block line or an existing palletizing station, Integration with a palletizer for an automatic stacking, wrapping and dispatch flow, Indoor halls with dust, heavy loads and continuous shifts, and upgrades of existing packing areas
MarketSyria & Middle East
QuoteBased on capacity & configuration
ModelQS-1000G-A
Series modelsQS-1000G-A / QST1200 / QST1800
StructureFixed base, rotating cantilever arm
ControlPLC + touch screen
Film handlingAutomatic feed, wrapping and cutting
Pre-stretchBuilt-in film pre-stretch mechanism
Adjustable settingsWrapping layers, lifting stroke, film tension
OperationStandalone unit or integrated in a palletizing line
PRICE FACTORS

What changes the machine price?

01

Daily capacity

Output target determines machine size, mould cycles and line configuration.

02

Automation

Pallet handling, cubing, batching and packaging change total project scope.

03

Block types

Hollow block, paver, interlock and curbstone may require different moulds and handling.

04

Service scope

Shipping, installation, training and spare parts are quoted by destination.

How the Cantilever Design Protects the Load

Wrapping equipment comes in two main arrangements. In one the pallet turns on a platform while the film head stands still. In the other the load stays put and the film carrier moves. The QS machine follows the second route. The base is anchored to the floor and only the cantilever arm rotates, sweeping the film around the pallet. Because the pallet itself never turns, tall or off-centre loads keep their balance from the first turn to the last. For high stacked aerated concrete, where a single wobble can scatter a whole pallet, this difference decides whether the wrap is safe to run at all.

Automatic Film Handling and Adjustable Parameters

A PLC and a touch screen manage the whole sequence. Film is fed, wrapped and cut without an operator touching the roll, and a one-touch command starts or stops the cycle. Wrapping layers, lifting stroke and film tension can each be set to suit the height, length and width of the load, so coverage stays tight and even instead of loose at the top and thin at the corners. A built-in pre-stretch mechanism pulls the film before it reaches the pallet, which raises the metres obtained from every roll and cuts consumable spending over a year of shifts.

Material Compatibility

The wrapper handles square palletised goods rather than one single product type. Aerated concrete blocks, cement bricks, gypsum blocks and general wall materials all run through the same machine. That flexibility matters to plants that switch product mixes between orders and to traders who wrap goods bought from several suppliers. The sealed film layer keeps dust, moisture and rain away from the product, holds loose pieces together and stops partial collapse during road transport.

Working Environment and Integration

The cantilever frame takes impact without bending, and the assembly is built for the dusty, heavy-load, continuous duty found in building material halls. Because there is no turning platform, floor space stays small, which helps plants that were not designed with a large packing bay. The machine can run as a standalone unit at the end of a line or be linked to a palletizer so that stacking, wrapping and dispatch form one continuous automatic process with no manual film application at any stage.

New Lines and Upgrades

The equipment is offered for the QS-1000G-A, QST1200 and QST1800 configurations, so it can be specified with a new line or added to an existing palletizing station. Plants use it to move packing work away from manual labour, to standardise site operations and to send out loads that arrive at the customer in the same condition they left the yard.

FAQ

Frequently Asked Questions

Why use a cantilever machine instead of a turntable wrapper?
On a cantilever wrapper the base is fixed and only the arm rotates, so the pallet never turns. Tall or off-centre loads keep their balance through the whole cycle, and there is no risk of a high stack toppling or scattering as it starts to spin on a platform.
Which materials can be wrapped?
The machine takes square palletised loads rather than one fixed product. Aerated concrete blocks, cement bricks, gypsum blocks and general wall materials all pass through it, so plants that change their product mix between orders can use the same wrapper without new tooling.
Can wrapping parameters be adjusted for different pallet sizes?
Yes. Wrapping layers, lifting stroke and film tension are all adjustable, so the operator can match the wrap to the height, length and width of the load. The result is even, tight film coverage on small pallets and on tall ones instead of a setting that only suits the average case.
Does the machine need an operator during wrapping?
Film feeding, wrapping and cutting all run automatically after the one-touch start, so no one has to apply, wrap or cut film by hand. The operator sets the parameters and starts the cycle, which removes a heavy and repetitive manual task from the packing bay.
Is the wrapper suitable for a dusty factory environment?
It is built for exactly that duty. The cantilever frame resists impact and the assembly stands up to dust, heavy loads and continuous running, the normal conditions in a building materials hall. The small footprint also helps plants that were not planned with a wide packing area.
ENGINEER REVIEW

Send your capacity and get a real configuration.

Request Quote →
WhatsApp