PRODUCTS

Concrete Block Making Machines and Complete Production Lines

From a single machine to a complete plant, configured to the block sizes and power supply at your site.

We build automatic and hydraulic concrete block machines, hollow block machines, paver and kerbstone machines, and complete production lines covering batching, mixing, forming, conveying and curing. Moulds are made for the block sizes that sell in your local market, and a custom mould can be produced from a drawing. Automation ranges from semi-automatic single machines to a fully automatic line, chosen by project size and the operators you have. Voltage and frequency are configured for the destination country. To specify the right machine we need five inputs: block size, required daily output, raw material, voltage and frequency, and the automation level you want. Send those five and you get a written recommendation rather than a generic price list.

Automatic Block Making Machine

Best for
Higher output with automatic cycle
Block types
Hollow, solid and paver blocks
Automation
Fully automatic
Machine details → Get a quote

Hydraulic Block Making Machine

Best for
Higher compaction, stable mould filling
Block types
Hollow and solid blocks
Automation
Hydraulic drive
Machine details → Get a quote

Hollow Block Making Machine

Best for
Starting a small block yard
Block types
Hollow blocks for walls
Automation
Semi to fully automatic
Machine details → Get a quote

Paver Block Making Machine

Best for
Pavers, kerbstones and yards
Block types
Paver and interlock shapes
Automation
Automatic with paver mould
Machine details → Get a quote

Complete Production Line

Best for
A complete plant project
Block types
Full block range
Automation
Automatic with curing and handling
Machine details → Get a quote

Choose by production requirement

Requirement Suggested machine Why Page
Starting a small block yard Hollow block machine Lower entry cost, small crew View
Load-bearing blocks at volume Automatic machine Automatic cycle, consistent sizes View
Pavers and kerbstones Paver machine Paver mould and flat forming View
A complete plant from scratch Complete line Batching, mixing, forming, handling in one flow View
Expanding an existing plant Hydraulic machine Fits an existing pallet system View

Actual output depends on block size, cycle time and mould. Capacity is confirmed per mould during quoting instead of a single blanket figure.

Where to start when you are choosing equipment

CEMBRIQ's product pages each cover one machine family or one piece of line equipment, from compact host machines for a first plant up to hydraulic presses, curing and cubing systems and complete lines. Every page explains what the equipment is built to produce, the moulds and pallets involved, the working cycle, and the footprint, power and labour it needs on site.

Read this section once you roughly know what you want to sell and how much you need to make per shift, and you are now choosing between configurations. It suits buyers weighing a smaller host against a bigger one, or comparing a forming machine on its own with a fuller line.

By the end you should be able to name the family that fits your product mix and output target, list the points to confirm before you ask for a quotation, and see clearly which items sit outside the equipment itself.

All machines

Concrete Block Making Machine | CEMBRIQ
QST Series

Concrete Block Making Machine

Core machine for hollow blocks, solid blocks, pavers and curbstones.

View machine →
Automatic Block Making Machine | CEMBRIQ
QST1800

Automatic Block Making Machine

High-output automatic block machine for industrial production lines.

View machine →
Hydraulic Block Making Machine | CEMBRIQ
Hydraulic Series

Hydraulic Block Making Machine

Hydraulic forming system for stable density and consistent blocks.

View machine →
Hollow Block Making Machine | CEMBRIQ
QST1200

Hollow Block Making Machine

Machine configurations for common hollow concrete block sizes.

View machine →
Cement Block Making Machine | CEMBRIQ
QST815

Cement Block Making Machine

Cement-sand-aggregate block production with configurable automation.

View machine →
Paver Block Making Machine | CEMBRIQ
QST Series

Paver Block Making Machine

Paver and interlocking block production with interchangeable moulds.

View machine →
Block Moulding Machine | CEMBRIQ
QST Series

Block Moulding Machine

Flexible moulding platform for multiple concrete block products.

View machine →
Concrete Block Production Line | CEMBRIQ
QSGW / QSDJ

Concrete Block Production Line

Complete production line covering batching, forming, handling and cubing.

View machine →
QS-1000G-A Stationary Palletizer for Block Production Lines | CEMBRIQ
QS-1000G-A

QS-1000G-A Stationary Palletizer for Block Production Lines

A stationary PLC palletizer that stacks about 1,700 pallets a day with one single operator

View machine →
QS Fully Automatic Cantilever Pallet Wrapping Machine | CEMBRIQ
QS-1000G-A

QS Fully Automatic Cantilever Pallet Wrapping Machine

A cantilever wrapper that rotates around the load, so pallets stay still and never shift

View machine →
QSD Belt-Frame Curing Fully Automatic Block Production Line | CEMBRIQ
QSD

QSD Belt-Frame Curing Fully Automatic Block Production Line

Wet bricks sit on metal frames to cure in place, while lithium transfer vehicles move them

View machine →
QSMT Pallet-Free Wet-Batch Block Molding and Palletizing Machine | CEMBRIQ
QSMT1000

QSMT Pallet-Free Wet-Batch Block Molding and Palletizing Machine

Bricks leave the mold soft and are stacked wet on the spot, so no pallets are needed

View machine →
QST6-15 Automatic Concrete Block Molding Machine | CEMBRIQ
QST6-15

QST6-15 Automatic Concrete Block Molding Machine

One mold set, four product types, from 8,640 hollow blocks to 61,440 bricks per shift

View machine →
QST1000 Servo-Driven Automatic Concrete Block Machine | CEMBRIQ
QST1000

QST1000 Servo-Driven Automatic Concrete Block Machine

Closed-loop servo drive holds position, speed and torque steady on every forming cycle

View machine →
QST1500 Fully Automatic Concrete Block Molding Machine | CEMBRIQ
QST1500

QST1500 Fully Automatic Concrete Block Molding Machine

Servo-driven block molding machine for stable, dense concrete block output.

View machine →
QSGW Intelligent High-Position Automatic Brick Production Line | CEMBRIQ
QSGW

QSGW Intelligent High-Position Automatic Brick Production Line

A closed-loop automatic line from batching to packaging for blocks and pavers.

View machine →
QSRGV Intelligent Mother-and-Child Vehicle Curing Line | CEMBRIQ
QSRGV

QSRGV Intelligent Mother-and-Child Vehicle Curing Line

Unmanned curing line with rail and battery drive and millimeter accuracy.

View machine →
QS-1200A Low-Position Automatic Palletizer | CEMBRIQ
QS-1200A

QS-1200A Low-Position Automatic Palletizer

Floor-mounted automatic palletizer with 18-second layers and about 3,800 pallets a shift.

View machine →
QS-1200B Self-Retaining High-Level Palletizing System | CEMBRIQ
QS-1200B

QS-1200B Self-Retaining High-Level Palletizing System

Patented high-position palletizer builds fork holes and stacks up to 1400 mm high.

View machine →
QS-1000G-B Simple Palletizing System | CEMBRIQ
QS-1000G-B

QS-1000G-B Simple Palletizing System

Simple palletizing system for near-square pallet groups in about 16 seconds a layer.

View machine →
QS-1000G-C Dual-Station Simple Palletizing System | CEMBRIQ
QS-1000G-C

QS-1000G-C Dual-Station Simple Palletizing System

Two palletizing stations, bidirectional stacking, one continuous dry-brick flow

View machine →
QS-1000Y Mobile Brick Stacking Machine | CEMBRIQ
QS-1000Y

QS-1000Y Mobile Brick Stacking Machine

Travels across the yard to stack cured bricks where the piles actually stand

View machine →
QSSX-16A Overhead Rotary Automatic Strapping Machine | CEMBRIQ
QSSX-16A

QSSX-16A Overhead Rotary Automatic Strapping Machine

Overhead rotary head straps a full brick stack in about eleven seconds

View machine →
QSPY-16A Traversing Automatic Strapping Machine | CEMBRIQ
QSPY-16A

QSPY-16A Traversing Automatic Strapping Machine

Traversing strap feed that keeps straps moving without jamming bricks

View machine →
QS-1200 Automatic Pallet Feeder | CEMBRIQ
QS-1200

QS-1200 Automatic Pallet Feeder

Keeps empty pallets flowing into the bin at the main machine's pace

View machine →
CMP Series Vertical Shaft Planetary Mixer | CEMBRIQ
CMP

CMP Series Vertical Shaft Planetary Mixer

Planetary blades that sweep the whole drum and leave no dead mixing zone

View machine →
PL Series Concrete Batching Machine QS-1200 | CEMBRIQ
QS-1200

PL Series Concrete Batching Machine QS-1200

Automatic sand, gravel and cement batching with dual-speed weighing and 2 to 4 hoppers.

View machine →
QS Series Forklift Clamp for Brick Handling | CEMBRIQ
QS-1200

QS Series Forklift Clamp for Brick Handling

Move 500 to 800 standard bricks per lift with a 2000 kg hydraulic clamp and no pallets.

View machine →
Brick-Making Mold for Concrete Block Machines | CEMBRIQ
QS1500

Brick-Making Mold for Concrete Block Machines

Alloy steel molds, CNC machined to micron accuracy for standard, hollow and paving blocks.

View machine →
Aerated Block Hole-Keeping Palletizing Line QST1200 | CEMBRIQ
QST1200

Aerated Block Hole-Keeping Palletizing Line QST1200

Automated line that sorts and re-palletizes aerated blocks while leaving forklift holes.

View machine →
Semi-Dry Gypsum Block Production Line QS600 | CEMBRIQ
QS600

Semi-Dry Gypsum Block Production Line QS600

Semi-dry gypsum block line with atomized water addition and no drying stage.

View machine →
QS600 Fully Automatic Static Pressing Brick Machine | CEMBRIQ
QS600

QS600 Fully Automatic Static Pressing Brick Machine

Hydraulic static pressing forms dense non-fired bricks, pavers and curbstones at low noise.

View machine →
QS1000 Bidirectional Static Pressing Brick Machine | CEMBRIQ
QS1000

QS1000 Bidirectional Static Pressing Brick Machine

Twin-direction hydraulic static pressing for dense, uniform, high-strength bricks.

View machine →
QS Series Suspended Roller Cement Pipe Production Line | CEMBRIQ
QS Series

QS Series Suspended Roller Cement Pipe Production Line

One wet line, many pipe profiles: suspended roller forming for water and drainage work.

View machine →
QSD-A Series Cement Tile Forming Machine | CEMBRIQ
QSD-A

QSD-A Series Cement Tile Forming Machine

High-pressure filter pressing turns cement and sand into dense, weatherproof roof tiles.

View machine →
QSD-B Series PC Stone Molding Machine | CEMBRIQ
QSD-B

QSD-B Series PC Stone Molding Machine

Wet mix filtration plus vacuum molding for curbs and pavers that replace quarry stone.

View machine →
CX20-45 Nine-Head Pneumatic Polishing Machine | CEMBRIQ
CX20-45

CX20-45 Nine-Head Pneumatic Polishing Machine

Nine flexible heads polish the face, the side and the chamfer in one pass.

View machine →
PC Brick Sandblasting and Shot Blasting Machine | CEMBRIQ
PC Brick Texturing Machine

PC Brick Sandblasting and Shot Blasting Machine

Matte, frosted or antique textures on PC brick faces, recovered abrasive, low dust.

View machine →
Hard Rock Cone Crusher Production Line QST1200 QST1800 | CEMBRIQ
QST1200 / QST1800

Hard Rock Cone Crusher Production Line QST1200 QST1800

Closed-loop two-stage crushing and screening for granite, basalt and iron ore.

View machine →
Construction Waste Recycling Production Line QST1200 QST1800 | CEMBRIQ
QST1200 / QST1800

Construction Waste Recycling Production Line QST1200 QST1800

Turn demolition concrete, brick and stone into graded recycled aggregate and sand.

View machine →
Intelligent Sand Making Production Line 50 to 500 t/h | CEMBRIQ
QST1200 / QST1800

Intelligent Sand Making Production Line 50 to 500 t/h

Manufactured sand from 50 to 500 t/h with MR and DM sand makers, screening and washing.

View machine →
Mobile Crushing Station Production Line QST1200 QST1800 | CEMBRIQ
QST1200 / QST1800

Mobile Crushing Station Production Line QST1200 QST1800

Jaw and impact mobile crushers in a two-stage closed loop that moves with the job.

View machine →
QS FSD-A Large Slab Forming Machine for P.C Stone | CEMBRIQ
QS FSD-A

QS FSD-A Large Slab Forming Machine for P.C Stone

High-pressure filtration molding shapes mortar concrete into dense artificial stone slabs.

View machine →
HGF Dry Mix Mortar Production Line 20 to 60 t/h | CEMBRIQ
HGF Series

HGF Dry Mix Mortar Production Line 20 to 60 t/h

Enclosed dry mortar plant from 20 to 60 t/h with PLC weighing and controlled dust.

View machine →
QST1200 Concrete Mixing Plant for Ready-Mix Supply | CEMBRIQ
QST1200

QST1200 Concrete Mixing Plant for Ready-Mix Supply

Twin-shaft forced mixing and PLC control for steady, high-volume concrete output.

View machine →
QST1800 Mobile Concrete Mixing Station on Trailer | CEMBRIQ
QST1800

QST1800 Mobile Concrete Mixing Station on Trailer

Trailer mounted batching and mixing for road and bridge sites that relocate often.

View machine →
QT5-15 Automatic Concrete Block Molding Machine | CEMBRIQ
QT5-15

QT5-15 Automatic Concrete Block Molding Machine

Hydraulic pressure plus high frequency vibration forming blocks in 15 to 20 seconds.

View machine →
QST1200 Foamed Concrete Block Production Line | CEMBRIQ
QST1200

QST1200 Foamed Concrete Block Production Line

Non-autoclaved foamed blocks from fly ash, tailings and slag at lower investment.

View machine →
QST1800 Foamed Cement Wallboard Production Line | CEMBRIQ
QST1800

QST1800 Foamed Cement Wallboard Production Line

Automated mould circulation line for lightweight foamed cement wall panels.

View machine →
QS-1200 Twin-Shaft Concrete Mixer (JS500 to JS1500) | CEMBRIQ
QS-1200

QS-1200 Twin-Shaft Concrete Mixer (JS500 to JS1500)

Forced twin-shaft mixing for batching plants, precast yards and block factories.

View machine →
QT4-15 Automatic Concrete Block Molding Machine | CEMBRIQ
QT4-15

QT4-15 Automatic Concrete Block Molding Machine

Vibration plus hydraulic pressing, 15 to 20 seconds per cycle for steady block output.

View machine →
QS800 Unidirectional Static Pressing Brick Machine | CEMBRIQ
QS800

QS800 Unidirectional Static Pressing Brick Machine

Hydraulic static pressing for dense bricks, clean edges, low noise, and steady strength.

View machine →
QS1000 Unidirectional Static Pressing Brick Machine | CEMBRIQ
QS1000

QS1000 Unidirectional Static Pressing Brick Machine

Larger molding area and a 600 mm cylinder for high density brick output at low noise.

View machine →
QS1500 Unidirectional Static Pressing Brick Machine | CEMBRIQ
QS1500

QS1500 Unidirectional Static Pressing Brick Machine

Large tonnage static pressing with a 720 mm cylinder for high volume paving brick lines.

View machine →
QS800 Bidirectional Static Pressing Brick Machine | CEMBRIQ
QS800

QS800 Bidirectional Static Pressing Brick Machine

Upper and lower pressing together for even brick density, no pallet handling, low noise.

View machine →
QS1500 Bidirectional Static Pressing Brick Machine | CEMBRIQ
QS1500

QS1500 Bidirectional Static Pressing Brick Machine

Large two way static pressing, no pallets and no vibration, built for heavy block output.

View machine →
QST1800 Servo Driven Concrete Block Molding Machine | CEMBRIQ
QST1800

QST1800 Servo Driven Concrete Block Molding Machine

Servo driven block molding built for continuous, high density output on large lines

View machine →
QST1200 Electro Hydraulic Concrete Block Molding Machine | CEMBRIQ
QST1200

QST1200 Electro Hydraulic Concrete Block Molding Machine

Electro hydraulic servo molding that raises output while cutting energy and noise

View machine →
QST8-15 Automatic Concrete Block Molding Machine | CEMBRIQ
QST8-15

QST8-15 Automatic Concrete Block Molding Machine

Compact and economical block machine with full automation and quick mould changes

View machine →

Where to go next

Questions buyers ask before ordering

What block sizes can these machines produce?

Block size is set by the mould. We build moulds for the sizes common in your market, and can make a custom mould once we have a drawing or exact dimensions.

What information do you need to quote?

Block size, required daily output, raw material, voltage and frequency, automation level and site area. With those five points we can specify the right machine or line.

Can you supply a complete line, not just one machine?

Both. We start from a single machine and go up to a complete line covering batching, mixing, forming, conveying and curing.

Do you provide installation and training?

Yes. The scope of installation and operator training is defined in the quotation, because it depends on site conditions and automation level.

Will the machine match my local voltage?

Yes. Machines are configured for the destination supply, for example 380V 50Hz, 415V 50Hz or 440V 60Hz.

How long is delivery?

It depends on configuration and quantity, and is fixed in the quotation once specifications are confirmed. We do not quote a flat number of days before that.

WhatsApp