QS1500 Unidirectional Static Pressing Brick Machine
Large tonnage static pressing with a 720 mm cylinder for high volume paving brick lines.

The QS1500 is the top model in the unidirectional static pressing range, built for large building material enterprises that need heavy volume. A large tonnage, fully hydraulic unidirectional stroke compacts and forms the raw material in one pass. The finished brick holds high density, even strength, and neat shapes, without layering or cracks, and its flexural and compressive strength sits well above traditional equipment, which places it at the center of high volume production of high strength non-fired bricks, paving bricks, and plaza bricks. The machine keeps the same working habits as the rest of the range: low noise, high density, and light demands on staff. All hydraulic static pressing means no high frequency vibration, so the shop floor stays quieter and cleaner. A full process automatic control system links feeding, pressing, demolding, and discharge, cutting manual involvement and labor cost. The heavy duty integrated steel frame has been stress relief aged, giving it rigidity and load capacity that resist deformation during years of high pressure work. Mold changes switch between colored floor tiles, plaza bricks, solid bricks, and curbstones, and the machine accepts fly ash, slag, and construction debris as feedstock.
Configured around output, blocks and operating conditions.
Large tonnage hydraulic stroke with a 720 mm cylinder bore covers a 1,440 x 850 mm forming area., One mold yields 40 pieces of 200 x 100 x 60 mm colored floor tile in a standard cycle., All hydraulic static pressing keeps noise low and the workshop cleaner than vibration lines., Full process automatic control links feeding, pressing, demolding, and discharge without manual steps., Stress relief aged steel frame resists deformation through years of high pressure operation.
Typical decision factors
What changes the machine price?
Daily capacity
Output target determines machine size, mould cycles and line configuration.
Automation
Pallet handling, cubing, batching and packaging change total project scope.
Block types
Hollow block, paver, interlock and curbstone may require different moulds and handling.
Service scope
Shipping, installation, training and spare parts are quoted by destination.
The Flagship of the Static Press Range
The QS1500 sits at the top of the unidirectional static pressing family, made for large building material enterprises that measure output in whole shifts rather than single molds. Every part of the design serves volume: a big molding footprint, a wide cylinder bore, and a pressure head that holds steady through long running days.
Large Tonnage Hydraulic Forming
A large tonnage, all hydraulic unidirectional stroke compacts and forms the material in one pass. Bricks leave the press dense, even in strength, and clean at the edges, with no layering and no cracks. Flexural and compressive values exceed what conventional equipment delivers, which is why this model anchors large scale production of high strength non-fired bricks, paving bricks, and plaza bricks.
Low Noise, High Density, Light on Labor
The machine keeps three working traits from the rest of the range. All hydraulic static pressing means no high frequency vibration, so noise stays low and the production floor stays cleaner. Density is high because pressure is applied evenly. And the work is light on staff, since the cycle runs itself once parameters are set.
Full Process Control
A full process automatic control system achieves seamless linkage among feeding, pressing, demolding, and brick discharge. Operators watch the panel instead of moving material by hand, so manual intervention falls sharply and labor cost drops. Steady cycle timing also makes downstream handling and stacking easier to plan.
Structure and Staying Power
The body is a heavy duty integrated steel structure treated with stress relief aging. It keeps strong rigidity and high load capacity, and stays free of deformation even under long term high pressure operation. Failure rates stay low, maintenance stays simple, and after sales running costs remain under control.
Molds, Raw Materials, and Output
Mold changes give the QS1500 flexible output: colored floor tiles, plaza bricks, solid bricks, and curbstones, all from one frame. On colored floor tiles of 200 x 100 x 60 mm, each mold yields 40 pieces within the standard cycle. Raw material compatibility is broad, with fly ash, slag, and construction debris all usable, which lowers production cost while promoting resource recycling. Key figures are a maximum pressure of 31.5 MPa, a 720 mm main hydraulic cylinder bore, a forming cycle of 20 to 25 seconds, a forming area of 1,440 x 850 mm, and a tray of 1,500 x 900 x 30 mm. Total power is 88.4 kW and machine weight is about 39 tons.