Legal

Terms of Service

The rules for using this website and for the quotations issued through it, including what a published figure means before a contract is signed.

QUICK ANSWER

This website publishes technical information about concrete block machines and production lines. A quotation issued through the site is an offer to negotiate, not a binding contract; a contract exists only when a signed order document names the machine, the price, and the delivery terms. Published capacities are typical values measured under stated conditions, and the machine configuration in the signed contract governs the delivery. The supplier named in contracts is Quanzhou Qisheng Machinery Manufacturing Co., Ltd.

Terms of Service: what this page covers

These Terms of Service set out the basis on which you may use this website and the way information published here should be read. They cover browsing, downloads, quotations requested through the site, and the limits of what a website can promise about machinery that is configured for each buyer. They do not replace a signed supply contract. Where a signed contract and this page disagree, the signed contract governs. Please read these Terms of Service before relying on any figure, photograph or document published here, and contact us if anything is unclear before you place an order.

Using this website

This website is published by the CEMBRIQ brand as an information and enquiry channel for concrete block machines, moulds, and production lines. You may read, print, and share the pages for the purpose of evaluating equipment. You may not copy the site in bulk, republish it as your own, or use automated tools to extract its content for a competing commercial listing.

CEMBRIQ is the independent public brand used on this website. Products and commercial documents are supplied through Quanzhou Qisheng Machinery Manufacturing Co., Ltd.

Technical information and specifications

The figures published here, such as forming force, motor power, pallet size, cycle time, and pieces per shift, describe real machines in the range. They are typical values measured under the conditions stated next to them, and those conditions matter: the raw material mix, the moisture content, the block height, and the number of shifts all change the real output of a machine.

Machine specifications are improved over time. A published figure is therefore an indication of the configuration at the time of writing, not a permanent promise. Where a signed contract contains a specification table, that table governs.

Quotations

A quotation prepared from an enquiry on this site describes a proposed configuration and a price. It remains an offer to negotiate until an order is confirmed in writing. Unless a quotation states otherwise, the price covers the machine or line as described and does not include freight, insurance, import duties, taxes levied at destination, foundations and civil works, or the power supply connection at your site.

Because these items vary widely by destination, they are quoted separately when required. Quotations also carry a validity period; after it expires, prices and availability are reconfirmed.

Orders and contracts

A binding relationship begins when an order document is signed by both parties and names the equipment, the configuration, the price, the delivery term, and the payment schedule. From that point the obligations of each party are the ones written in that document.

Technical drawings, layout plans, and installation instructions prepared for an order are part of that order and are not published on this website.

Photographs, drawings, and documents

Photographs of machines, engineering drawings, capacity tables, and the text on this site belong to the supplier of the equipment. You may use them inside your own project evaluation and internal planning. You may not use them in advertising, in a tender document submitted under another company's name, or in any way that presents the equipment as being of a different origin.

Links to other sites

Where this site links to another website, that website is controlled by its own operator and its own terms apply. No responsibility is taken for the content, accuracy, or availability of a site reached through an external link.

Availability and liability

The site is maintained so that buyers can reach the technical team, but no guarantee is given that it will be available without interruption or free of error. To the extent permitted by applicable law, no liability is accepted for loss arising from reliance on a published figure before a contract is signed, or from an interruption in the availability of the site.

Nothing in these terms limits the obligations that a signed contract places on the supplier of the equipment, including any warranty written into it.

Governing law

These terms, and any contract concluded for equipment described on this site, are governed by the laws of the People's Republic of China, unless a signed contract names a different law or a different forum. Where the parties have agreed a dispute resolution clause, that clause applies.

Changes to these terms

These terms are updated when the way the site operates changes. The version published on this page is the version in force, and a contract signed under an earlier version continues to be governed by the terms set out in that contract.

Contact

Questions about these terms can be sent to jinsenjiu@gmail.com. Commercial and technical enquiries are handled through the quotation form, and the team can also be reached on WhatsApp at +86 158 8041 2886.

FAQ

Frequently Asked Questions

Is a quotation from this website binding?
No. A quotation issued through the site is an offer to negotiate. A binding relationship begins only when an order document is signed by both parties and names the equipment, the configuration, the price, the delivery term, and the payment schedule.
Are the machine capacities published on this site guaranteed?
They are typical values measured under the conditions stated next to them. Real output depends on the raw material mix, moisture content, block height, and the number of shifts worked. Where a signed contract contains a specification table, that table governs the delivery.
What is not included in a quoted price?
Unless a quotation states otherwise, the price covers the machine or line as described. Freight, insurance, import duties, destination taxes, foundations and civil works, and the power connection at your site are quoted separately, because they vary widely by destination.
Who is the supplier named in the contract?
CEMBRIQ is the independent public brand used on this website. The equipment and the commercial documents are supplied through Quanzhou Qisheng Machinery Manufacturing Co., Ltd., which is the entity named as supplier in the quotation and the contract.
May I reuse the photographs and drawings published here?
You may use them in your own project evaluation and internal planning. They may not be used in advertising, in a tender submitted under another company's name, or in any way that presents the equipment as being of a different origin.
Which law governs a contract concluded through this site?
These terms and any contract for equipment described on this site are governed by the laws of the People's Republic of China, unless a signed contract names a different law or forum. Where the parties have agreed a dispute resolution clause, that clause applies instead.
NEXT STEP

Get a project-specific price, not a catalog number.

Request Quote →
WhatsApp