QS1000 Unidirectional Static Pressing Brick Machine
Larger molding area and a 600 mm cylinder for high density brick output at low noise.

The QS1000 is a hydraulic brick-making machine sized for mid-sized and large building material plants. It forms bricks by pure hydraulic unidirectional static pressing, pushing steady high pressure into the mold in a single stroke instead of shaking the mix into place. Bricks leave the mold with high density, even strength, and clean faces, free from layering and cracks, and their flexural and compressive values sit above what vibration equipment manages. That profile fits high strength non-fired bricks, pavement bricks, and plaza bricks. The process runs without high frequency vibration, so noise drops and the workshop becomes a cleaner place to work. Full automatic control joins spreading, pressing, demolding, and discharge into one linked sequence, which cuts manual handling and labor cost. The frame is a heavy duty integrated steel structure given stress relief aging treatment, so it holds rigidity and load capacity through long pressure cycles. Molds can be swapped for colored floor tiles, plaza bricks, solid bricks, and curbstones. The machine also takes fly ash, slag, and construction debris as raw material, trimming material cost while reusing industrial waste.
Configured around output, blocks and operating conditions.
A 600 mm hydraulic cylinder bore drives dense forming across a 1,100 x 850 mm molding area., Bricks come out with even strength and clean faces, free from layering or cracking., Static hydraulic pressing removes high frequency vibration, keeping workshop noise low., Stress relieved integrated steel frame resists deformation through continuous high pressure cycles., Mold changes cover floor tiles, plaza bricks, solid bricks, and curbstones on one machine.
Typical decision factors
What changes the machine price?
Daily capacity
Output target determines machine size, mould cycles and line configuration.
Automation
Pallet handling, cubing, batching and packaging change total project scope.
Block types
Hollow block, paver, interlock and curbstone may require different moulds and handling.
Service scope
Shipping, installation, training and spare parts are quoted by destination.
Built for Mid-Sized and Large Plants
The QS1000 is a hydraulic brick-making machine aimed at mid-sized and large building material enterprises that need higher volume per shift than entry level presses deliver. Its molding area and pressure head are sized so each cycle yields more pieces, while cycle time stays inside the range production planners expect from a static press line.
The Static Pressing Process
Forming is pure hydraulic and unidirectional. A stable high pressure stroke compacts the raw material in one pass, with no vibration stage. Bricks come out dense and uniform in strength, with neat edges, and without the layering or cracking that weaker forming methods leave behind. Flexural and compressive results sit above traditional vibration machines, so the output suits high strength non-fired bricks, pavement bricks, and plaza bricks.
Quiet Operation and a Better Floor
Since the machine uses no high frequency vibration, operating noise stays low and the workshop environment improves. Staff working near the press notice the difference over a full shift, and plants located near housing gain more room to run longer hours without complaint.
Full Automatic Control
Control links material spreading, pressing, demolding, and brick discharge into one sequence, with no manual step between them. Operators supervise rather than handle material, so labor cost per brick falls and timing stays consistent from the first mold of a shift to the last.
Frame and Service Life
The body is a heavy duty integrated steel structure that has gone through stress relief aging treatment. It resists deformation under sustained high pressure, keeps failure rates low, and makes routine maintenance simple. Long term running costs stay within reach because the structure holds its alignment instead of drifting over the years.
Molds, Materials, and Duty
Changing molds lets the QS1000 produce colored floor tiles, plaza bricks, solid bricks, and curbstones, so the same frame covers several product lines for municipal roads, community landscaping, and rural infrastructure. Raw material choice is wide: fly ash, slag, and construction debris all feed the press, lowering material cost and putting solid waste to work. Key figures include a maximum pressure of 31.5 MPa, a 600 mm main hydraulic cylinder bore, a molding cycle of 20 to 25 seconds, a molding area of 1,100 x 850 mm, and a tray of 1,200 x 900 x 20 mm. Total power is 66.4 kW and machine weight is about 29 tons. These figures also let a plant check whether existing mixers and conveyors can keep pace with the press.