Hydraulic Brick-making Machine

QS1500 Bidirectional Static Pressing Brick Machine

Large two way static pressing, no pallets and no vibration, built for heavy block output.

QS1500 Bidirectional Static Pressing Brick Machine | CEMBRIQ
QUICK ANSWER

The QS1500 is the flagship of the bidirectional static pressing line, developed for large building material enterprises. Upper and lower hydraulic rams close on the mold at the same time, so uniform two way pressure compacts the mix and the finished brick holds consistent density and stable strength through its full height. Layering, bulging, and cracking are eliminated, and flexural and compressive values outperform traditional brick-making equipment. That makes it core equipment for mass production of high strength standard bricks, hollow blocks, and solid bricks. Three advantages shape its daily work: no pallet is required, the sequence runs fully automatically, and labor demand is low. There is no high frequency vibration during forming, so noise levels fall and the workshop environment improves noticeably. A PLC based automatic control system coordinates the whole process, from material distribution and bidirectional pressing through demolding and brick discharge, with no manual pallet handling. The body is a heavy duty integrated steel structure that has been stress relief aged, giving rigidity and load capacity that resist deformation under long term high pressure. Mold changes cover standard bricks, hollow blocks, and solid bricks, and fly ash, slag, and construction debris all work as raw material.

MACHINE SELECTION

Configured around output, blocks and operating conditions.

Upper and lower rams press at once, holding even density through the full brick height., Running without pallets removes the heaviest manual task from the press line., PLC based control links distribution, two way pressing, demolding, and discharge automatically., No high frequency vibration during forming keeps noise low and the workshop cleaner., Stress relief aged steel frame holds rigidity under long term high pressure operation.

Typical decision factors

AutomationConfigured by project scope
ProductsMass production of high strength standard bricks and hollow blocks, Solid brick output for large civil and infrastructure construction, Municipal engineering projects with steady daily volume targets, Plants reusing fly ash, slag, or construction debris as raw material
MarketSyria & Middle East
QuoteBased on capacity & configuration
ModelQS1500
Maximum Pressure31.5 MPa
Main Hydraulic Cylinder Bore Diameter720 mm
Forming Cycle18 to 22 seconds
Forming Area1,440 x 850 mm
Total Power108.2 kW
Overall Machine Weightabout 43 tons
PRICE FACTORS

What changes the machine price?

01

Daily capacity

Output target determines machine size, mould cycles and line configuration.

02

Automation

Pallet handling, cubing, batching and packaging change total project scope.

03

Block types

Hollow block, paver, interlock and curbstone may require different moulds and handling.

04

Service scope

Shipping, installation, training and spare parts are quoted by destination.

Flagship Two Way Pressing

The QS1500 is the flagship of the bidirectional static pressing range, developed for large building material enterprises that need heavy daily output. Where an entry level press serves a single product line, this machine is meant to carry a plant, running long shifts without losing timing or brick quality.

Uniform Pressure From Both Directions

Upper and lower hydraulic rams close on the mold together, applying uniform two way pressure. The mix compacts symmetrically, so density stays consistent and strength stays stable through the full height of the brick. Layering, bulging, and cracking are eliminated, and flexural and compressive values outperform traditional brick-making equipment. That makes the machine core equipment for mass production of high strength standard bricks, hollow blocks, and solid bricks.

No Pallets, Full Automation, Less Labor

Three advantages guide operation. No pallet is required, so boards are not carried in and out by hand. The sequence runs fully automatically, from material distribution and bidirectional pressing to demolding and brick discharge. And labor demand is low, because operators supervise the panel rather than move material, which lowers labor input and labor cost across the shift.

Quieter, Cleaner Production

Forming involves no high frequency vibration. Noise levels drop, the building and the surrounding area feel less load, and the workshop becomes a better place to spend a working day. Plants in built up areas gain more freedom in operating hours.

Frame and Durability

The machine body is a heavy duty integrated steel structure that has undergone stress relief aging treatment. It delivers excellent overall rigidity and strong load capacity, and stays deformation free even under long term high pressure operation. The failure rate is low, routine maintenance is simple, and post operation costs stay economical.

Molds, Materials, and Figures

Broad mold adaptability lets the QS1500 produce standard bricks, hollow blocks, and solid bricks, meeting demand across municipal engineering, civil construction, and large scale infrastructure work. Contracts that run across several product types gain most, because one press covers standard bricks, hollow blocks, and solid blocks without extra machines. Raw material compatibility is strong, with fly ash, slag, and construction debris all usable, which cuts procurement cost and promotes resource recycling. Key figures are a maximum pressure of 31.5 MPa, a 720 mm main hydraulic cylinder bore, a forming cycle of 18 to 22 seconds, a forming area of 1,440 x 850 mm, total power of 108.2 kW, and total machine weight of about 43 tons, so foundations should be sized for that load.

FAQ

Frequently Asked Questions

Why does the QS1500 press from two directions?
Upper and lower rams close on the mold together, so pressure is applied symmetrically. Density stays consistent and strength stays stable through the full brick height, and layering, bulging, and cracking are avoided even on taller products that strain unidirectional presses.
What are the main parameters of the QS1500?
Maximum pressure is 31.5 MPa through a 720 mm main hydraulic cylinder bore. The forming cycle runs 18 to 22 seconds over a forming area of 1,440 x 850 mm. Total power is 108.2 kW and total machine weight is about 43 tons.
Does the machine need pallets during production?
No. The press runs without pallets, so no boards are carried in or out by hand. Combined with the fully automatic sequence for distribution, pressing, demolding, and discharge, this lowers labor input and labor cost across each shift. Fewer people on the press line also means less exposure to moving parts and less fatigue across a full shift.
Which products can the QS1500 make?
Broad mold adaptability lets it produce standard bricks, hollow blocks, and solid bricks, serving municipal engineering, civil construction, and large scale infrastructure work. Fly ash, slag, and construction debris can all be used as raw material. A single press can therefore serve wall, block, and paving contracts in the same season.
How loud is the QS1500 in operation?
Forming is static and hydraulic, so there is no high frequency vibration stage. Noise stays lower than on vibration brick machines and the workshop feels calmer, which matters for plants running long shifts or working near residential areas. Enclosed panels and standard damping keep the sound inside the machine frame.
ENGINEER REVIEW

Send your capacity and get a real configuration.

Request Quote →
WhatsApp