Hydraulic Brick-making Machine

QS1000 Bidirectional Static Pressing Brick Machine

Twin-direction hydraulic static pressing for dense, uniform, high-strength bricks.

QS1000 Bidirectional Static Pressing Brick Machine | CEMBRIQ
QUICK ANSWER

Built for medium and large block plants, the QS1000 presses bricks from two directions at once. An upper and a lower hydraulic cylinder move in sync, so the mix inside the mold is compacted from top and bottom with matched pressure. The result is a blank with even density from face to core, which removes the delamination, bulging and edge cracking that single-direction presses often leave behind. Compressive and flexural values sit above what traditional unidirectional machines deliver, so the line suits high-strength standard bricks, hollow blocks and solid blocks. Three goals shaped the design: less manual work, no pallet handling and a high degree of automation. Because forming is static rather than vibratory, a QS1000 runs quietly and keeps the workshop clean. A PLC system links material distribution, pressing, demolding and brick take-off into one cycle, so operators are not needed at every station. The frame is a single heavy steel weld, stress-relief aged before machining, which holds rigidity under years of high pressure. Changing the mold set switches the machine between brick types, and fly ash, slag and construction debris can all go into the mix.

MACHINE SELECTION

Configured around output, blocks and operating conditions.

Upper and lower hydraulic rams press in sync for even density from surface to core, Welded one-piece steel frame, stress-relief aged, stays accurate under continuous high pressure, PLC and touch screen run distribution, pressing, demolding and discharge as one cycle, Pallet-free operation cuts manual handling and lowers the crew needed per shift, Mold changes switch output between standard bricks, hollow blocks and solid blocks, Accepts fly ash, slag and crushed construction debris alongside sand and cement

Typical decision factors

AutomationConfigured by project scope
ProductsMedium and large block plants making structural units for municipal works, Civil building projects needing standard bricks and hollow blocks on schedule, Rural infrastructure programs with high daily output targets, Plants that want to reuse fly ash, slag and demolition debris in the mix
MarketSyria & Middle East
QuoteBased on capacity & configuration
ModelQS1000
Maximum Pressure31.5 MPa
Machine Weight~33 t
Total Power105.4 kW
Main Cylinder Bore600 mm
Forming Cycle18 to 22 s
Forming Area1100 x 850 mm
Pallet Size1200 x 950 x 20 mm
PRICE FACTORS

What changes the machine price?

01

Daily capacity

Output target determines machine size, mould cycles and line configuration.

02

Automation

Pallet handling, cubing, batching and packaging change total project scope.

03

Block types

Hollow block, paver, interlock and curbstone may require different moulds and handling.

04

Service scope

Shipping, installation, training and spare parts are quoted by destination.

How Two-Direction Pressing Works

The QS1000 carries an upper cylinder and a lower cylinder that travel together through one forming cycle. Both act on the same mold, so the concrete is squeezed from the top and the bottom at once instead of being pushed down against a fixed base. Pressure reaches 31.5 MPa and stays even across the whole mold face. This is what separates the machine from an ordinary press: the density gradient that builds up in one-way compaction does not form here, and the finished block keeps the same strength at its center as at its skin.

Frame and Hydraulic Construction

The body is a single welded steel structure rather than a bolted assembly. After welding it is given stress-relief aging treatment, which lets internal stresses settle before the machining of the guide surfaces. The frame therefore holds its geometry under continuous high load and does not creep out of alignment after a few years of shifts. The main cylinder has a bore of 600 mm. Machine weight is about 33 tons and total installed power is 105.4 kW. Large-diameter guide columns keep the moving platen parallel through the stroke, which protects the mold and extends its service life.

PLC Control and the Automatic Cycle

A PLC with a touch-screen terminal governs the sequence: material distribution, upper and lower pressing, demolding and brick discharge. Once the recipe is stored, the operator starts a cycle and the controller repeats it. There is no pallet to feed by hand, which removes the hardest manual job on a traditional line and cuts the number of people needed per shift. Alarm screens report a fault and stop the cycle before the mold or the frame is damaged.

Products, Molds and Raw Materials

The forming area is 1100 by 850 mm and the standard pallet measures 1200 by 950 by 20 mm, with a forming cycle of 18 to 22 seconds. Mold sets can be exchanged to produce standard bricks, hollow blocks and solid blocks of several sizes. Because the process does not depend on a narrow aggregate grade, the mix can take fly ash, slag and crushed construction debris alongside sand, cement and stone chips. That keeps raw material purchasing flexible and lowers cost per piece.

Where the Machine Fits

Typical installations are municipal engineering works, civil building projects and rural infrastructure programs that need a steady supply of structural units. The series is offered in QS600, QS800, QS1000, QS1500, QST1200 and QST1800 sizes, so a plant can start on a smaller frame and move up as its order book grows. Low noise, no pallet logistics and a small operating crew are the reasons most buyers in the Middle East, Africa and South East Asia choose a static press over a vibrating table.

FAQ

Frequently Asked Questions

What is bidirectional static pressing and why does it matter?
An upper and a lower hydraulic ram press the same mold at once, so density stays even from the brick face to its core. One-way compaction builds a density gradient and can leave delamination or edge cracks. Two-way pressing removes that gradient, which raises compressive and flexural strength and keeps rejects low.
Does the machine need wooden pallets?
No. The forming and discharge sequence is designed so the brick leaves the mold without a pallet being fed by hand. That removes the heaviest manual task on a traditional line and lowers the number of operators required per shift, while also cutting the cost of replacing pallets.
Which products can one QS1000 produce?
With the right mold set it produces standard bricks, hollow blocks and solid blocks of several sizes. Changing molds is the only step needed to switch product. The forming area is 1100 by 850 mm, so larger paving and hollow units can also be run where the mold is available.
Can it use fly ash or construction waste?
Yes. The mix accepts fly ash, slag and crushed construction debris together with sand, cement and stone chips. Because the process does not demand a narrow aggregate grade, plants can substitute a large part of the raw material with industrial by-products and lower the cost per finished piece.
How long is one forming cycle?
A complete cycle runs 18 to 22 seconds, depending on the product height and the mix. Total installed power is 105.4 kW and the main cylinder bore is 600 mm, which is what allows the short cycle to be held at 31.5 MPa working pressure without losing density.
What sizes are in this series?
The range covers QS600, QS800, QS1000, QS1500, QST1200 and QST1800. A new plant can start on a smaller frame and move to a larger one as order volume grows, which keeps the first investment lower without changing the process or the mold logic.
ENGINEER REVIEW

Send your capacity and get a real configuration.

Request Quote →
WhatsApp