QS800 Unidirectional Static Pressing Brick Machine
Hydraulic static pressing for dense bricks, clean edges, low noise, and steady strength.

The QS800 is a hydraulic brick-making machine that forms bricks by unidirectional static pressing. Instead of vibration, it uses steady high pressure to compact the mix in one stroke, so the finished brick comes out dense, even in strength, and clean at the edges, without layering or cracks. Flexural and compressive values stay above what vibration machines usually deliver, which suits high strength non-fired bricks, paving bricks, and plaza tiles. Because the process uses no high frequency vibration, the machine runs quietly and the workshop stays cleaner and more comfortable. Control covers the whole sequence, linking feeding, pressing, demolding, and discharge, so manual work drops and labor cost falls. The frame is a heavy duty integrated steel structure that has gone through stress relief, giving it rigidity and load capacity that hold under long term high pressure work. Changing the mold switches output between colored floor tiles, plaza tiles, solid bricks, and curbstones. The machine also accepts fly ash, slag, and construction debris, so plants can cut raw material cost while using industrial waste.
Configured around output, blocks and operating conditions.
Pure hydraulic unidirectional static pressing forms each brick in one stroke without vibration., Finished bricks hold high density, even strength, and neat faces free from layering or cracks., Static hydraulic operation removes high frequency vibration, lowering noise in the workshop., Integrated stress relieved steel frame keeps rigidity under long term high pressure work., Changing molds switches output between floor tiles, plaza tiles, solid bricks, and curbstones.
Typical decision factors
What changes the machine price?
Daily capacity
Output target determines machine size, mould cycles and line configuration.
Automation
Pallet handling, cubing, batching and packaging change total project scope.
Block types
Hollow block, paver, interlock and curbstone may require different moulds and handling.
Service scope
Shipping, installation, training and spare parts are quoted by destination.
How Unidirectional Static Pressing Works
The QS800 is a hydraulic brick-making machine that relies on pure hydraulic unidirectional static pressing. Stable high pressure compacts and forms the raw material in one step, without a vibration stage. The result is a brick with high density, even strength, and neat faces, free from layering and cracks. Flexural and compressive values stay well above what traditional vibration equipment reaches, so the machine fits high strength non-fired bricks, paving bricks, and plaza tiles.
Low Noise and a Cleaner Workshop
Because forming is fully hydraulic and static, the machine produces no high frequency vibration. Operating noise drops, the building and the surrounding area feel less load, and the production floor stays cleaner. Plants that run near housing or inside a city zone often pick this route for that reason alone. Longer operating hours also become easier to manage with neighbours and local rules.
Automation Across the Cycle
Control covers the whole process and links feeding, pressing, demolding, and brick discharge into one smooth sequence. Manual intervention falls, so fewer operators are needed per shift and labor cost follows. The pattern also keeps cycle timing steady, which helps downstream handling and curing planning.
Frame and Long Term Reliability
The machine body is a heavy duty integrated steel structure that has undergone stress relief treatment. That gives the frame high rigidity and load capacity, and it holds shape under long hours of high pressure work. Failure rate stays low, maintenance is straightforward, and running costs remain predictable over the life of the machine.
Molds, Materials, and Output
By changing molds, the QS800 produces colored floor tiles, plaza tiles, solid bricks, and curbstones. It also handles a broad range of raw materials, including fly ash, slag, and construction debris, which lowers material cost and puts industrial waste to use. Main parameters are a maximum pressure of 31.5 MPa, a 500 mm main hydraulic cylinder bore, a molding cycle of 20 to 25 seconds, a molding area of 1,100 x 680 mm, and a tray of 1,100 x 700 x 20 mm. Total power is 54.9 kW and machine weight is about 24 tons. Site teams can plan the layout around the molding area and tray size, so the press, the conveyor, and the curing yard line up without wasted floor space. The tray of 1,100 x 700 x 20 mm and the molding area of 1,100 x 680 mm define the working footprint. Typical duty covers municipal roads, community landscapes, and rural infrastructure.