RFQ

Request a Factory Quote

Share the details that change machine selection and price. Our engineering sales team can reply with a more useful configuration.

01

Project & contact

Add technical details (optional)
02

Production target

What should I send with an RFQ?

Send 5 things: the block type (hollow, solid or paver), the daily output you need, the raw material you have, the voltage and frequency at your site, and the automation level you want. These five inputs decide the machine, the mould and the power, and without them any figure stays a rough estimate.

Can the machine be set to my block size?

Yes. The mould is made to the block size you sell, and it is chosen together with the automation, the power supply and the support equipment in one configuration. Send the block size and the blocks per shift, and the mould is calculated on that basis rather than on a generic model.

What happens after I send the RFQ?

We read the block type and daily output first, then engineering proposes the configuration with the mould, automation, power and support equipment. After that you get a factory quote for that configuration, with the scope for shipping and installation. We do not send a generic catalogue instead of an answer.

FAQ

Questions before you send the request

What should I include with the request?
Block type, the daily output you need, your raw material, the voltage and frequency at your site, and the automation level you want. Machine selection depends on those five inputs.
What happens after I submit the request?
We read your block type and the capacity you need, engineering proposes the configuration with mould, automation, power and support equipment, and you receive a factory quote for that configuration with shipping and installation scope.
Can I send the details on WhatsApp instead?
Yes. Send your block type and daily capacity on WhatsApp and the team replies with a proposed configuration, in Arabic or English.
WhatsApp