Power and site supply

Block making machine electricity consumption: what the kW figures cover

Block making machine electricity consumption starts from one published figure, the installed capacity of the host press, and grows with everything wired around it: pallet feeding, batching, cubing, curing transfers and lighting. This guide lists the published kW of each QST model, converts it into kWh per shift, and shows how to size a transformer or a generator against real site conditions.

QUICK ANSWER

Block making machine electricity consumption is published as installed capacity per model: 34.4 kW on the QST6-15, 44.9 kW on the QST8-15, 48.9 kW on the QST1000, 57.6 kW on the QST1200, 69.1 kW on the QST1500 and 104 kW on the QST1800, all on a 380 V / 50 Hz three phase supply. That figure covers the host press. A full shift also draws pallet feeding at 3 kW, cubing at 29.5 kW on the QS-1200A, the mixer, the compressor and lighting, so the site connection is sized on the largest simultaneous draw.

What does block making machine electricity consumption include?

Block making machine electricity consumption is published as one number per model, the installed capacity of the host press, and that number carries a specific meaning. It is the sum of the motors and drives wired to the machine: the hydraulic pump motor, the vibration motors, the moulding and feeding drives, the pallet feed drive and the PLC cabinet. It is a sizing figure for the site connection, not a meter reading for a working shift.

The distinction matters because two buyers read the same 104 kW in two different ways. One asks the utility for a 104 kW connection and stops there, and the connection trips the first week the mixer, the cuber and the compressor run together. The other adds every load on the site and asks for a connection sized on the largest simultaneous draw. The second plant runs, and the first one blames the machine.

Installed capacity of each QST model

These are the published figures, and they move in step with pallet size and machine weight rather than with price.

ModelInstalled capacityPalletMachine weightPublished output ceiling
QST6-1534.4 kW980 x 680 x 20 mm12 t8,640 hollow blocks to 61,440 standard bricks per shift
QST8-1544.9 kW980 x 860 x 22 mm14 tUp to 90,000 standard bricks per 8-hour shift
QST100048.9 kWMedium formatConfiguredConfigured to the product
QST120057.6 kW1350 x 880 x 25 mm17 tUp to 120,960 standard bricks per 8-hour shift
QST150069.1 kW1350 x 1150 x 30 mm20 t220 kN vibration force, mould configured to product
QST1800104 kW1400 x 1400 mm34 tUp to 220,000 standard bricks per 8-hour shift

The static press family sits at a different level, because a hydraulic press spends its energy on pressure rather than vibration. The QS800 bidirectional press draws 70 kW, the QS1000 105.4 kW and the QS1500 108.2 kW, each of them pressing at 31.5 MPa with a forming cycle of 18 to 22 seconds. The pallet-free QSMT1000 draws 57.5 kW at 13 to 18 seconds per cycle, so a plant that forms on pallets and a plant that forms without them do not sit on the same electrical footing.

How many kWh does a shift take at installed capacity?

Multiply the installed capacity by the shift length and the answer is the ceiling for energy, the figure a plant would reach if every motor drew its nameplate value for eight hours without a pause. No plant does that, but the ceiling is what a transformer must survive.

ModelInstalled capacitykWh in an 8-hour shift at full drawPublished pieces per shiftWh per piece at that ceiling
QST6-1534.4 kW275.2 kWh8,640 hollow blocks31.9 Wh
QST8-1544.9 kW359.2 kWhUp to 90,000 bricks4.0 Wh
QST120057.6 kW460.8 kWhUp to 120,960 bricks3.8 Wh
QST150069.1 kW552.8 kWhMould configured to productFollows the mould
QST1800104 kW832 kWhUp to 220,000 bricks3.8 Wh

Read the last column with care. Hollow blocks are the heavy case, because a 390 x 190 x 190 mm block is a large piece and a 6-piece mould returns far fewer pieces per cycle than a standard brick mould. The 31.9 Wh figure for the QST6-15 is a ceiling on hollow blocks, and the 3.8 to 4.0 Wh figures are ceilings on standard bricks. A plant selling hollow blocks spends far more energy per piece than a plant selling bricks on the same host, and that difference belongs in the cost per block, not only in the machine price.

Why the meter reads less than the installed capacity suggests

Installed capacity is the sum of every motor, and the motors do not all run at once. The hydraulic pump loads during the press stroke and eases between strokes. The vibration motors run for a few seconds inside each cycle and rest for the remainder. The pallet feed drive moves once per cycle, and the PLC cabinet draws a small continuous load.

So a 104 kW machine does not consume 104 kW continuously, and a quotation that adds up nameplates overstates the running bill while a connection sized on nameplates alone still proves right. Both statements hold at once. The nameplate total is the correct basis for the cable, the breaker and the transformer, because those components must carry the simultaneous peak. The energy bill follows the actual load curve, which only a meter at commissioning can establish. Ask for a measured draw at commissioning, at the working cycle and on the products you will sell.

What else on the site draws power

The press is the largest single load and rarely the only one. A plant that wires the press and forgets the loop around it discovers the shortfall in the first week.

  • Pallet feeding. The QS-1200 automatic pallet feeder runs on a 3 kW motor with a cycle of about 13 seconds and holds three pallet stacks. Small as a load, but it runs all shift.
  • Cubing and packing. The QS-1200A low-position cuber draws 29.5 kW in total, of which 7.5 kW sits on the top plate and 14.2 kW on conveying, at about 18 seconds per layer. A cuber is a real load, not an accessory.
  • Batching and mixing. The mixer, the batching hoppers and the belt conveyors run on the cycle of the press, so they draw power in the same rhythm and add to the simultaneous peak.
  • Curing transfers. A QSRGY finger-car line runs its sub-car on 380 V AC stepped down to 36 V DC on the rail, or on a 36 V lithium battery with a BMS. A battery version shifts part of the load off the grid and off the peak.
  • Compressor, lighting and water. Air for the pneumatic functions, light for a night shift and water for curing are continuous loads, small individually and constant over 8 hours.

How to size the transformer and the cable

Size the connection on the largest simultaneous draw, not on the sum of the nameplates. The method is the same at every plant: list every load, mark which ones can run together, take the worst combination, add a margin for starting current, and hand that figure to the utility.

The starting current of the largest motor is usually what decides the breaker. A press that starts under load pulls several times its rated current for a few seconds, and a connection sized on the running total alone trips at start. Tell the utility or the panel builder which motor is the largest, its starting method and whether the plant will start the press and the mixer together. On a 380 V / 50 Hz three phase supply, an unbalanced or undersized cable shows up first as a voltage dip during the press stroke, and the machine then faults on a low-voltage alarm that looks like a control fault.

Load groupWhat to addWhen it runs
Host pressPublished installed capacity of the modelAll shift, peaking at the press stroke
Pallet feeding3 kW on the QS-1200Once per cycle, all shift
Cubing29.5 kW on the QS-1200AContinuous while pallets arrive
Batching and mixingMixer and conveyor nameplatesEvery cycle, in step with the press
Curing transfersSub-car chargers or rail supplyBetween cycles, plus charging
Air, light, waterCompressor, lighting, pumpsContinuous over the shift

Unstable supply, generators and hot sites

A site with an unstable grid changes the calculation in two ways. A generator must carry the starting current of the largest motor as well as the running load, and a generator sized only on the running total stalls when the press starts. The second change is the cost per kWh, which on diesel is far above a grid tariff and turns energy into a visible line in the cost per block.

Heat and dust belong in the same paragraph, because they decide how much of the installed capacity reaches the mould. Dust on the vibration unit and hot hydraulic oil both push a machine toward derating and stoppages. Hydraulic oil cooling and dust protection around the vibration unit are running costs that begin on the first shift, and on a site above 40 degrees they are not optional extras.

How to put electricity into the cost per block

The arithmetic is short once the local tariff is known: take the kWh for a shift from the table above, apply the share of the shift the machine actually runs, and divide by the pieces sold from that shift. A plant running a QST6-15 at 85 percent of its cycle and selling 8,640 hollow blocks has a different energy cost per block from a plant running the same machine with a manual pallet handoff and a curing yard that stalls.

Do not use the nameplate ceiling as the bill. Use it to size the connection, then use a measured draw or a monthly meter reading to price the block. And compare offers on the same basis: a line that adds a cuber and an automatic feeder cuts labour and raises connected load at the same time, so the comparison belongs in cost per block, not in kW.

What to send before you ask about power

Six answers turn a kW figure into a site plan.

  1. The model you are considering, or the daily output target if the model is still open.
  2. The supply available at the site: voltage, phase, frequency and the capacity of the existing transformer.
  3. Whether the plant will run on the grid, on a generator, or on both.
  4. Which support equipment is in scope: feeder, cuber, mixer, compressor, curing line.
  5. The products and the shift pattern, since both change the energy per piece.
  6. The highest summer temperature at the site, because cooling and dust protection follow it.

Send them through the request for quotation form and the reply comes back with the installed capacity of the whole line, the recommended connection and the equipment that draws it. For the machine side of the same question, the concrete block making machine range lists the published figures for every model.

Send your site supply and daily target and the power plan for your plant comes back with the models that fit it.

FAQ

Frequently Asked Questions

How much electricity does a block making machine use?
Published block making machine electricity consumption ranges from 34.4 kW on the QST6-15 to 104 kW on the QST1800, with 44.9 kW on the QST8-15, 48.9 kW on the QST1000, 57.6 kW on the QST1200 and 69.1 kW on the QST1500. Those are installed capacity figures for the host press on a 380 V / 50 Hz three phase supply, and the plant connection must also carry batching, cubing, pallet feeding and lighting.
How many kWh does a block machine take in an eight hour shift?
At full draw the arithmetic is installed capacity times eight hours: 275.2 kWh on the QST6-15, 359.2 kWh on the QST8-15, 460.8 kWh on the QST1200, 552.8 kWh on the QST1500 and 832 kWh on the QST1800. These are ceilings rather than bills, because the hydraulic pump and the vibration motors do not draw their rated current continuously through the cycle.
Why is the meter reading lower than the kW on the nameplate?
Because installed capacity sums every motor, and the motors run on different parts of the cycle. The vibration motors work for a few seconds per cycle, the pump loads during the press stroke, the pallet feed moves once per cycle and the PLC draws a small continuous load. The nameplate total is correct for sizing the cable and transformer, while the bill follows the actual load curve.
What transformer size does a block plant need?
Size it on the largest simultaneous draw, not on the sum of the nameplates. List every load, mark which can run at the same time, take the worst combination, add margin for the starting current of the largest motor, and give that figure to the utility. A connection sized on the running total alone will trip when the press starts under load.
Can a block machine run on a generator?
It can, with two conditions. The generator must carry the starting current of the largest motor as well as the running load, and a unit sized only on the running total stalls when the press starts. The second condition is cost, because diesel generation prices the kWh far above a grid tariff and turns energy into a visible line in the cost per block.
Does the cuber and the pallet feeder add much load?
Together they add more than buyers expect. The QS-1200 pallet feeder runs on a 3 kW motor with a cycle of about 13 seconds, and the QS-1200A cuber draws 29.5 kW in total, with 7.5 kW on the top plate and 14.2 kW on conveying, at about 18 seconds per layer. Both belong in the connection request from the first day.
How do I calculate the energy cost per block?
Take the kWh for a shift, apply the share of the shift the machine actually runs, and divide by the pieces sold from that shift. A QST6-15 at 85 percent of its cycle with 8,640 hollow blocks is a heavy case per piece, while a standard brick mould returns far more pieces for a similar kWh, so the product mix moves the number more than the tariff does.
Does hot weather change block machine electricity consumption?
It changes the usable capacity more than the rated kW. Hot hydraulic oil and dust on the vibration unit push a machine toward derating and stoppages, so hydraulic oil cooling and dust protection are running costs from the first shift. Above 40 degrees they are not optional, and the connection should allow for the cooling load they add.