Delivery and transport

Block Delivery Truck: Own Fleet or Hired Transport

The delivery truck is where a block plant's margin quietly disappears: overloaded trips, hand unloading, pallets that never return. This page sets out the payload arithmetic, the own versus hire decision, delivery radius limits and the pallet return rules that keep the fleet honest.

QUICK ANSWER

A block delivery truck carries about 660 hollow blocks on a 10 tonne payload and about 1,330 on a 20 tonne payload, because a hollow block weighs 14 to 16 kg and weight, not volume, sets the load. Hire transport while the plant delivers fewer than a few loads a day or covers long distances, and buy a truck only when it runs loaded most working days on a route the plant controls.

The delivery truck is the part of a block plant that leaves the gate, and it is where a margin that looked healthy on paper quietly disappears. Blocks are sold by the piece and delivered by the tonne, so the price of a delivered block is a freight calculation with a product attached. Plants that quote delivery as an afterthought, or absorb it, usually discover the cost after a year of growing volume, when the cheapest customer turns out to be the one three hours away.

This page covers the payload arithmetic, the decision between owning a truck and hiring one, the radius a plant can serve, unloading at the customer's site, and the pallet problem that follows every delivery. It continues from the yard and loading page, which deals with the loading face and the stack layout inside the plant, and from the delivery lead time page, which deals with the date the plant can promise.

How many blocks fit on a block delivery truck?

Work from weight first. A hollow block of 390 by 190 by 190 mm weighs 14 to 16 kg, so a truck's payload divided by 15 kg gives the load in blocks before volume is considered. A 10 tonne payload is about 660 blocks. A 20 tonne payload is about 1,330. A light 5 tonne truck is about 330 blocks, which is a quarter of one shift on a compact line.

PayloadHollow blocks by weightApproximate volumeWhat it is good for
5 tonnesAbout 330 blocksAbout 4.6 cubic metresYard counter sales, small contractor loads, tight streets
10 tonnesAbout 660 blocksAbout 9.3 cubic metresDaily contractor accounts inside the town
20 tonnesAbout 1,330 blocksAbout 18.7 cubic metresProject supply, dealer replenishment, one trip instead of three

Volume rarely binds on hollow blocks, because the product is dense. It starts to matter with pavers and kerbstones, where the load is stacked higher and the truck's floor area and side height, not its payload, decide the count. It also matters when blocks travel on pallets: a pallet at 980 by 860 mm carrying one mould cycle of six blocks is a light, bulky unit, so a palletised load fills the deck long before it reaches the weight limit. That is the trade a plant makes when it delivers on pallets, and it is the argument for delivering clamp-loaded stacks to customers who own a forklift.

What does one delivery trip cost, and how do you price freight per block?

A trip costs the same whether the truck is full or half full: a driver's day, fuel for the round trip, tyre and maintenance wear, insurance and, if the truck is hired, the hire charge and the waiting time. Divide that trip cost by the blocks actually on the deck and the freight per block appears. The arithmetic is unforgiving, which is why a half load to a nearby site can cost more per block than a full load to a site twice as far.

Round trip time sets how many trips fit in a day, and that is the number most plants never compute. A one hour round trip with twenty minutes of loading and unloading allows six to eight trips in a working day. A three hour round trip allows two, sometimes three with a good loading face. Same truck, same driver, a third of the output. Delivery radius is therefore a capacity decision, not a map decision, and it should be written into the price list as a zone rather than negotiated per customer.

Two costs hide inside the trip figure. Waiting at the customer's site, where a contractor is not ready to unload and the truck stands for two hours, is a real cost that belongs in the quotation as a free waiting window followed by a charge per hour. Loading is the other: a clamp forklift loads 40 hollow blocks per trip and needs 34 trips to fill a 20 tonne load, so the loading face, not the road, sometimes sets the departure time. The yard and loading page covers the loading layout that keeps that number down.

Is it cheaper to own a block delivery truck or to hire one?

Ownership converts a variable cost into a fixed one, and fixed costs are only cheap when the asset is used. A truck that runs two loads a day, five days a week, on a route the plant controls, is usually cheaper owned, because the plant captures the margin the haulier would take and can load at its own gate at its own hour. A truck that runs one load a day, or sits idle in the rainy season, is a depot expense with a driver attached.

ItemOwn truckHired transport
Cost behaviourFixed: capital, insurance, driver salary, workshop, tyres, whether it runs or notVariable: paid per trip or per block, zero when there is no order
ControlLoading hour, route, presentation at the customer's gate, driver trainingWhatever the haulier's schedule allows, which matters during a peak
RiskBreakdown, accident, driver absence, resale value of a used truckDamage and delay sit with the haulier, if the contract says so
Best fitDaily deliveries inside a short radius, dealer replenishment, plant with a workshopLong hauls, project supply, seasonal peaks, a plant still proving its volume

The usual mistake is buying the truck with the machine, before the order book exists. A new plant's delivery pattern is unknown in month one and obvious by month nine. Hire first, record the trips, the routes and the waiting time for two quarters, and let that record decide the specification of the truck the plant eventually buys. The record also tells the plant which customers are profitable to serve and which should be handed to a dealer, a decision the selling page covers.

What delivery radius can a block plant serve profitably?

Serve the radius in which a truck can make at least three loaded round trips a day, and treat everything beyond it as a different business. At that point freight per block grows faster than the price the market will pay, and the plant has three honest options: raise the delivered price by zone, hand the territory to a dealer who consolidates loads from several plants, or sell the same blocks to a project in bulk so one trip carries a full deck.

A dealer is not a discount, it is a logistics trade. The dealer earns his margin by combining loads and holding stock closer to the buyers, and the plant gives up part of the gate price for that. The calculation to run is simple: the margin the dealer takes against the freight, waiting time and credit cost the plant avoids by not delivering there. When the dealer's margin is smaller than the avoided cost, the dealer is cheaper than the truck.

Who loads and unloads, and what happens when the customer has no forklift?

Loading is the plant's job and it should be quoted as included. Unloading is where the argument starts, because many contractors receive blocks at a site with no forklift, no clamp and no crane, and a 20 tonne load of blocks has to come off by hand. That is 1,330 blocks at 15 kg each, moved twice, once off the deck and once into a stack. It takes a crew most of a morning, it is the most common cause of a truck standing idle, and it is the reason a delivered price and a gate price are not comparable numbers.

Three ways to handle it. Deliver clamp-loaded stacks to customers who have a forklift, and say so in the price list. Deliver on pallets to customers who do not, and price the pallet into the load. Or send a labour crew with the truck and charge for it, which is honest and usually cheaper than the waiting time it replaces. Whichever route is chosen, the arrangement belongs in the quotation, not in a phone call on the morning of delivery.

How do you stop pallets leaving the gate and never coming back?

A pallet that goes out with a load is an asset in a customer's yard, and most customers have no reason to bring it back unless the plant makes it worth their while. Plants that ignore this buy a new tranche of pallets every year and cannot explain where the old ones went. The loss is invisible in the accounts because it arrives as a pallet purchase, not as a delivery cost.

Four rules keep it under control. Charge a deposit per pallet on the first delivery and refund it when the pallet returns in usable condition, which turns the pallet into the customer's property until he gives it back. Mark every pallet with the plant's code, painted or branded on the side, so a pallet in a competitor's yard can be identified. Put the pallet count on the delivery note and get it signed, so the return can be reconciled monthly instead of argued about. And triage returns: sound pallets back into circulation, damaged ones to the repair bench, broken ones out of service before they reach the machine and jam it.

There is a way to avoid the loop entirely for part of the business. A clamp forklift, such as the QS series clamp that grips finished stacks directly, loads blocks without pallets at all, so nothing has to come back. That works where the customer can unload a clamp-held stack, which usually means a contractor with a forklift on site. For everyone else, the pallet goes out and the deposit is what brings it home.

What damages blocks in transit, and who pays for it?

Blocks loaded at seven days are at roughly 65 to 80 percent of their 28 day strength, which is strong enough to stack and travel but not strong enough to be abused. Damage comes from four places: stacking too high so the bottom course carries the load, corners unprotected where the strap or the clamp touches, speed and road surface on a route with potholes, and a load that shifts because it was never strapped. Strapping machines exist precisely for this, and a wrapped or strapped stack also arrives looking like a product rather than a heap.

Agree the claim rule before the first delivery: photographs of the load on arrival, a claim window of 24 hours, and a clear statement of what the plant replaces and what it does not. A plant that replaces every chipped block without a photograph will be shown every chipped block in the district. A plant that refuses everything will lose the contractor over one bad load. The middle position, replacement of blocks broken before unloading when the photographs show it, is easy to defend and easy to administer.

How should delivery be written into the quotation and the invoice?

Five lines, and every one of them prevents an argument. Price: gate price or delivered price, stated separately so the customer can see what the transport costs. Zone: the radius covered by the delivered price and the rate beyond it. Loading and unloading: who does each, and what equipment the customer must have on site. Waiting: the free window, then the charge per hour. Pallets: the deposit per pallet, and the condition for refund.

The invoice then repeats the same five lines, and the delivery note carries the block count, the pallet count, the batch and the signature. That single sheet is what makes a monthly reconciliation possible, and it is the difference between a plant that knows its freight cost per block and one that discovers it at the end of the year. The team that records trips, loads and pallet returns weekly will price delivery correctly within a quarter, because the numbers stop being opinions.

Next step

Tell us the block you sell, the output you plan per shift and the towns you expect to serve. We will set the pallet size, the clamp or pallet handling arrangement and the loading face to match the way your customers take delivery, so the truck that arrives is loaded in the time the plant planned for. The yard, the curing area and the dispatch record are designed together, because a delivery that is slow at the gate cannot be fixed on the road.

FAQ

Frequently Asked Questions

How many blocks can a delivery truck carry?
It is a weight calculation first. A hollow block weighs 14 to 16 kg, so a 10 tonne payload is about 660 blocks and a 20 tonne payload about 1,330. Volume rarely binds on hollow blocks because the product is dense, but palletised loads fill the deck earlier, and pavers or kerbstones are limited by stack height rather than payload.
Is it cheaper to buy a truck or hire transport for block delivery?
Own a truck when it runs loaded on most working days inside a radius that allows several round trips, and the plant has a workshop and a driver it can rely on. Hire when volume is still being proven, when hauls are long or one off, or when deliveries peak for part of the year. Hire first and record the trips before specifying a purchase.
How do you calculate freight cost per block?
Divide the full cost of a round trip by the blocks actually loaded. The trip cost includes the driver, fuel, tyres, maintenance, insurance and any waiting time, and it does not fall when the truck leaves half empty. That is why a part load to a near site can cost more per block than a full load to a site twice as far.
How far can a block plant deliver profitably?
As far as a truck can make at least three loaded round trips in a working day. Beyond that, freight per block rises faster than the market price will follow, and the choice is a delivered price by zone, a dealer who consolidates loads, or bulk supply to a project that fills a truck in one order.
Who unloads blocks at the customer's site?
Agree it in writing before the first delivery. If the customer has a forklift, a clamp-loaded stack can be set down in minutes. If not, the load comes off by hand, which for a 20 tonne delivery means moving 1,330 blocks twice, and that is the most common reason a truck stands idle at a site.
How do you stop customers keeping the pallets?
Charge a refundable deposit per pallet, mark every pallet with the plant's code, record the pallet count on the delivery note and reconcile it monthly. Damaged pallets go to repair before they reach the machine. Where the customer can unload a clamp-held stack, delivering without pallets removes the return loop completely.
What causes block damage during delivery?
Stacking too high, unprotected corners under straps or clamps, speed and road surface, and loads that were never strapped. Blocks loaded at seven days are at roughly 65 to 80 percent of their 28 day strength, so they travel well when stacked and strapped properly and chip when they are thrown onto a truck and driven fast over a bad road.
Should the quotation show a delivered price or a gate price?
Show both. A separate gate price and delivered price let the customer see what transport costs and let the plant defend a zone based rate without renegotiating each order. The quotation should also state who loads, who unloads, the free waiting window and the pallet deposit, so the invoice repeats terms both sides already accepted.

Related machines

NEXT STEP

Get a project-specific price, not a catalog number.

Request Quote →
WhatsApp