Weighbridge for a Block Plant: Dispatch Weighing, Tickets and Reconciliation
Load weights, ticket fields, tolerance, calibration and the daily reconciliation between dispatch, stock and the customer's count.
A weighbridge for a block plant does three jobs: it checks incoming cement, sand and aggregate, it gives every outbound truck a net weight before the gate, and it closes the plant's mass balance between material in and blocks out. A 15 kg hollow block puts about 660 blocks on a ten tonne truck and 8,640 blocks in a shift at 129.6 tonnes. The ticket, not the bridge, is what settles a dispute, so the batch number and the pallet count matter as much as the net weight.
A block is quoted by the piece and delivered by the tonne, and the weighbridge is the only instrument in the plant that converts one into the other. That is why it earns its place twice: at the gate where the load leaves, and at the gate where cement, sand and aggregate arrive, which is usually where the first bridge is installed and where the first argument happens.
This page covers the weighing and the reconciliation that follows it: what the bridge does that counting cannot, what a load of blocks should weigh, what belongs on the ticket, how the instrument is kept in tolerance, what variance is acceptable, and how dispatch, stock and the customer's own count are closed at the end of the day. The yard and the loading face are on the finished block yard page. Freight arithmetic is on the delivery truck page. Sampling and crush tests are on the quality control page, and the terms that turn a short load into a contractual matter are on the supply agreement page.
What does a weighbridge do for a block plant?
Three jobs, in the order most plants discover them.
The first is incoming material: a cement bulk tanker, a sand tipper, an aggregate truck. The delivery note states a quantity and the bridge states another, and the difference over a year is the most common reason a plant that believed it had a weighing problem installs a bridge.
The second is dispatch. Every loaded truck gets a net weight before it leaves the gate, which produces a number that the plant and the customer can both check, and a ticket that does not depend on the memory of a loader driver at the end of a shift.
The third is the mass balance. Cement and aggregate in, blocks out, rejects and waste in between. A plant that weighs both ends of the process finds a leak that no daily report shows: a batching error that adds three percent of cement, a mixer that discharges early, a pallet of blocks that left the yard without a ticket.
What does weighing show that counting blocks cannot?
A count is a number of pieces and says nothing about what each piece weighs. Weight is the only measurement on a finished block that moves before the customer complains, because it follows the mix, the moisture and the compaction. A mix three percent short of cement shows as a light block before it shows as a weak one, and a machine running at the wrong vibration setting shows as a heavy or a light block long before a crush test is done.
On a 15 kg hollow block, three percent is 450 grams. On a 660 block load that is about 300 kg, which sits inside the noise of a bridge, but it is visible on the shift total: a shift where every truck runs 300 kg light is a shift with a mix problem, while a shift where the total is on plan and the individual tickets swing is a loading problem.
What should a truckload of blocks weigh?
Work from weight first, because hollow blocks are dense and a truck's deck fills by weight long before it fills by volume. The table uses a 15 kg hollow block of 390 by 190 by 190 mm.
| Load | Hollow blocks by weight | Product weight | What it is good for |
|---|---|---|---|
| 5 tonne truck | About 330 blocks | 5.0 tonnes | Yard counter sales, small contractor loads, tight streets |
| 10 tonne truck | About 660 blocks | 9.9 tonnes | Daily contractor accounts inside the town |
| 20 tonne truck | About 1,330 blocks | 20.0 tonnes | Project supply, dealer replenishment, one trip instead of three |
| One 8 hour shift on a compact line | 8,640 blocks | 129.6 tonnes | Thirteen loads on a ten tonne truck |
Two cautions belong here. On pavers and kerbstones the floor area and the side height decide the count before the payload does, so the weight check has to be read against the product, not against a generic figure. And weigh cured blocks at dispatch, not green blocks in the yard: a block that left the machine an hour ago still carries the water that will evaporate during curing, so it weighs more than the same block will weigh on a truck three days later. Pick one basis, print it on the ticket, and never compare a green weight with a cured one.
How does a weighbridge fit into the dispatch sequence?
In the simplest version, four steps. The truck enters empty and is weighed, or its tare is taken from a recorded plate weight for that vehicle and confirmed once a month. It is loaded at the face. It returns to the bridge loaded. The ticket prints gross, tare and net, and the gate pass is issued against that ticket.
A plant that weighs only the loaded truck and takes the tare from a list is doing one weighing instead of two, which is faster and accepts one risk: a truck that arrives with something already on the deck, or a driver who has added weight between visits. That risk is small at a plant loading its own fleet and real at a plant loading hired trucks.
The sequence has to run one way. A bridge that trucks enter and leave on the same lane becomes a queue that blocks the loading face, and the plant loses more in waiting time than the weighing is worth.
What does a weighbridge ticket have to record?
| Field | Why it is on the ticket |
|---|---|
| Ticket number, date, time in and time out | Places the load in a shift and in a queue, and makes the ticket traceable |
| Vehicle plate and trailer plate | Links the weight to the vehicle whose tare is on file |
| Driver name, and the haulier if the truck is hired | The person who can be asked about the load three weeks later |
| Customer and delivery address | Ties the weight to the invoice and to the delivery zone |
| Product, and the batch or mould number | The only route from a complaint back to the shift that made the block |
| Pallet count, or stack count where blocks travel clamped | Ties the load to the pallet fleet, which is otherwise invisible |
| Gross, tare, net | The three numbers the invoice is built on |
| Operator initials and the receiver's signature | Two names on one sheet, which ends most arguments about what left |
Two of those fields are usually missing, and both matter. The batch or mould number is what allows a quality complaint to be traced to a shift instead of to a whole month of production. The pallet count is what allows a plant to notice that a truck left with forty pallets and came back with none; that loss never appears in a production report because nobody counts pallets at the gate.
How is a weighbridge checked and kept in tolerance?
Three checks at three intervals. A zero check at the start of every shift, with the bridge empty, which catches a load cell that has drifted or a pit holding water. A known load check every week or every month, using a vehicle whose weight has been established and written down, which catches drift between official verifications. And a verification by the local weights and measures authority on the interval the law sets, which is the only check that produces a certificate a customer, a tax office and an insurer will accept.
The instrument is usually the least likely failure. A bridge sits on a foundation, and the foundation is what fails: water in the pit after a wet winter, an approach slab that has settled so the truck rocks as it enters, a load cell bolt worked loose by a year of heavy vehicles, a cable chewed in the yard. A 60 tonne road bridge with 20 kg display increments is a common specification for a plant of this size, and at ten tonnes net one increment is 0.2 percent, which is finer than the block weight variation the plant is trying to see.
What variance between ticket and invoice is acceptable?
| Source of difference | Usual size | What it means | Action |
|---|---|---|---|
| Instrument resolution | 0.2 percent at ten tonnes | Normal, and inside every tolerance | None |
| Block weight variation within a shift | 1 to 3 percent | Mix moisture, cement content, compaction | Compare against the shift average, not against one block |
| Curing water loss | 2 to 5 percent | Green block heavier than cured block | Weigh cured product at dispatch only |
| Count at destination | 1 to 2 percent | Counting method, breakage in transit | Agree the counting method in the contract |
| Net short against the invoice | Above 2 percent | A real short load | Re-weigh before the truck leaves, then investigate |
Set the tolerance in the supply agreement before the first load, not after the first dispute. The practical wording is short: net weight on the plant's verified bridge is the invoice basis, the verification certificate is available on request, and a load disputed at the gate is re-weighed before it leaves the yard, not after it has been unloaded three hours away.
How do dispatch, stock and the customer's receipt get reconciled?
Three numbers, closed daily. Production is the moulds completed in the shift multiplied by the blocks per mould, taken from the handover sheet. Dispatch is the sum of the net weights divided by the average piece weight of the product, or the pallet count where the plant ships full pallets of a known count. Customer receipt is the count or the weight at destination, from the signed ticket.
When the three agree inside tolerance, the day is closed. When they do not, the difference has an address, and there are only four: blocks made but not dispatched, which is stock in the yard and which the yard count confirms; blocks dispatched but not ticketed, which is the leak that costs money; blocks broken or rejected after forming, which the reject record should already show; and a block weight that has drifted, which the crush sample confirms.
Run the reconciliation weekly as well as daily, because a single day's variance is noise and a week of the same variance is a cause. The shift handover record supplies the production number, and the reject rate page supplies the third term.
Where should the weighbridge sit on the site layout?
Between the yard and the gate, on the one way loop, with an approach long enough for the longest vehicle the plant will ever receive to stand straight on the deck. A bridge is a foundation rather than a plate on the surface: the pit or the ramps carry the load of a forty tonne vehicle, they need drainage of their own, and they must not share a slab with the yard where a clamp forklift works all day.
Two layout choices decide how much the bridge slows dispatch. Put it before the loading face and every truck passes it twice on the way out, which is accurate and slow. Put it after the face and the truck is weighed once, loaded, with the tare from the vehicle record, which is faster and depends on the record being right. Most plants loading more than ten trucks a day choose the second and keep the first for incoming material, where a second weighing is worth the time.
What should be specified before a weighbridge is bought?
Six items, and the first is the one buyers get wrong. Capacity is set by the heaviest loaded vehicle plus a margin, not by the average truck. Display increment decides how fine the reading is. The print format decides whether the ticket can be exported to the invoicing system without retyping, which is where most of the clerk's day goes. The foundation type, pit or surface, has to be decided with the drainage, not after it. Power and surge protection matter because a bridge controller in a yard takes lightning. And the verification route matters because a bridge used for trade in most markets has to be verified and reverified on a schedule, and a plant that discovers this after installation pays for a second visit.
What should a buyer send for a dispatch review?
Three items: the product mix with the piece weight of each product, the number and size of trucks the plant expects to load in a day, and the site plan showing the gate, the yard and the loading face. We reply with the dispatch route on the layout, the weighing point, the ticket fields and the reconciliation sheet that matches the plant's handover record. Send the mix and the site plan with your target output, and the dispatch plan comes back alongside the yard layout and the supply agreement terms for the same project.
Frequently Asked Questions
Do we need a weighbridge if we sell blocks by the piece?
What capacity weighbridge does a block plant need?
Can the same weighbridge weigh cement and aggregate deliveries?
How accurate is a road weighbridge in practice?
Should blocks be weighed green or cured?
What should we do when a customer says a load is short?
Does a weighbridge replace counting blocks?
What is the simplest dispatch record without a weighbridge?
Related machines

Concrete Block Making Machine
Core machine for hollow blocks, solid blocks, pavers and curbstones.

Automatic Block Making Machine
High-output automatic block machine for industrial production lines.

Hydraulic Block Making Machine
Hydraulic forming system for stable density and consistent blocks.

Hollow Block Making Machine
Machine configurations for common hollow concrete block sizes.