Block Product Mix: What a New Plant Should Produce First
The product mix decides output, mould cost and how fast the plant earns. This is how to choose three products to start with, and which ones belong on a vibration press or a static press.
A block product mix is the short list of block types a plant can actually make with its mould set and machine time. For a new plant, three products are enough to start: one load bearing hollow block such as 390 x 190 x 190 mm, one paver or curb for road work, and one solid or porous filler. Output is planned on the slowest product in the mix, not the fastest, because a QST6-15 forms 6 hollow blocks per cycle but 32 to 36 standard bricks.
Most new block plants fail on the same point, and it is not the machine. They order a wide catalogue of moulds, run each product for a few days, and end up with a yard full of small lots nobody ordered. The product mix is a commercial decision that shows up directly in output, mould cost, pallet stock and curing area, so it deserves a proper answer before the mould set is confirmed.
The rule that keeps a plant profitable in its first year is narrow: choose products that local contractors already buy, in sizes their drawings already specify, and add variety only when a customer asks for it with an order attached.
What is a block product mix?
The mix is the set of products the plant can produce on demand, given its machine, its moulds and its curing capacity. It is not the same as the catalogue of everything the machine could theoretically form. A QST6-15 can run hollow blocks, porous blocks, standard bricks and coloured floor tiles, but it runs one mould at a time, so the mix is really a queue: which product gets machine hours this week.
Two numbers define that queue. Pieces per mould sets the output per cycle, and the forming cycle, 15 to 23 seconds on the QST6-15, sets how many cycles fit into a shift. Everything else in the mix is a consequence of those two.
Which block products actually sell in the Middle East?
Three groups carry most of the volume. Hollow load bearing blocks for walls, most often 390 x 190 x 190 mm or 390 x 200 x 200 mm, are the everyday product on almost every residential and commercial job, and they are the standard case on the hollow block application page. Pavers and curbs are bought by road, municipality and landscaping work, in 200 x 100 x 60 mm and similar paving sizes plus kerb profiles, with the mould differences set out under pavers and curbstones. Solid and porous blocks serve partition walls, fences and older construction methods that still specify them.
What changes between markets is the ratio, not the list. A city rebuilding housing stock consumes wall blocks in volume; a road programme consumes pavers and curbs. Before choosing a mix, count what is being built within delivery distance of the site, since block freight is heavy and rarely travels far.
How many products can one machine run?
One mould at a time. Changing from one block size to another means removing the mould, fitting the next one, and re-setting the position and the filling depth, which is measured in hours rather than minutes. That is why a plant with eight moulds and one machine is not flexible, it is slow: every switch costs a part of a shift.
A practical starting set is three moulds on the machine and a fourth in reserve. Three is enough to cover a wall block, a paving or kerb product and a filler product, and it keeps mould changes to a planned weekly rhythm instead of a daily scramble.
How does product mix change daily output?
Sharply, on the same machine and the same shift. The table below uses the published QST6-15 figures, with a 980 x 680 x 20 mm pallet and a 15 to 23 second forming cycle.
| Product | Typical size | Forming route | Pieces per mould | Output per 8 h |
|---|---|---|---|---|
| Hollow load bearing block | 390 x 190 x 190 mm | Vibration and pressurised forming | 6 | 8,640 to 11,520 |
| Porous block | 240 x 115 x 90 mm | Vibration and pressurised forming | 15 | 21,600 to 28,800 |
| Standard solid brick | 240 x 115 x 51 mm | Vibration and pressurised forming | 32 to 36 | 46,080 to 61,440 |
| Paver and coloured floor tile | 200 x 100 x 60 mm | Static press, 16 per mould on QS600, 40 on QS1500 | Mould dependent | Set by press cycle, 20 to 25 s |
The same host produces five times more standard bricks than hollow blocks in a shift. A plant that is sized on brick output and then sells wall blocks will look badly over-equipped, and a plant sized on hollow blocks that wins a paving order will look under-equipped. Capacity should always be quoted in the product you expect to sell most, with the other products stated separately.
Which products need a static press instead of a vibration press?
Dense paving and kerb work benefits from static pressing. The QS600 static press runs at 31.5 MPa with a 20 to 25 second cycle and forms 16 coloured paving bricks of 200 x 100 x 60 mm per mould, while the QS1500 forms 40 pieces per mould at 88.4 kW. Vibration press hosts handle pavers too, through a mould change, but a plant whose business is municipal paving usually plans a static press alongside the block host rather than pushing pavers through a block machine all day.
The decision point is order profile, not preference. If more than half of the expected revenue comes from paving and kerbs, the static press earns its place in the first phase. If paving is occasional, the block host with a paver mould is the cheaper answer.
How do you test a mix before committing to moulds?
Three checks, all cheap. First, ask five local contractors what block size their drawings specify and who they buy from now. Second, request sample blocks in the candidate sizes and get them tested for compressive strength after 28 days, since a mix that demoulds well can still fail the strength the local standard requires. Third, run a trial batch and measure the real cycle time on your own raw materials, because aggregate grading and moisture content move cycle time more than the catalogue figure suggests.
Order the moulds after those checks, not before. A mould is a single product tool, and a mould for a size nobody specifies is money that never produces a block.
What is the minimum sensible starting mix?
Three products: one wall block in the size local drawings specify, one paver or kerb profile that a road or landscaping customer is already buying, and one filler product that lets the plant keep forming when a main order pauses. That mix fills a shift, keeps the mould changes planned, and gives a sales story that a contractor can follow in one sentence.
Add the fourth and fifth moulds when a customer brings an order, not when a catalogue looks impressive. Mould variety is the easiest cost to add and the hardest to recover.
How does the mix decide pallet stock and curing area?
Pallets are product specific. QST6-15 uses a 980 x 680 x 20 mm pallet, QST1200 uses 1350 x 880 x 25 mm, QST1500 uses 1350 x 1150 x 30 mm, and QT4-15 uses 850 x 560 x 20 mm. Mixing products from two hosts in one curing yard means two pallet populations, and the yard has to hold both, empty and loaded.
Curing area follows the same logic. A hollow block pallet carries fewer pieces than a brick pallet, so a hollow block mix needs more pallets and more yard per cubic metre of finished product. Plan the first pallet purchase on the product that will dominate the mix, and buy the second pallet size only when that product is confirmed by orders.
How does the mix reach the customer?
Once the mix is fixed, the selling material writes itself: the sizes, the compressive strength each product reaches on your aggregate, the delivery radius, and the load per truck. That is the difference between a plant that quotes and a plant that waits. A contractor buying 200 mm wall blocks for a housing project wants three numbers, size, strength and delivery date, and a plant with a defined mix can answer all three on the phone.
A mix built on hollow blocks usually runs on a hollow block production line, while a paving-heavy mix is better served by a paver block production line. Send us the block sizes sold in your area and the products you expect to lead with. The mix, the mould set, the pallet stock and the line configuration are then planned together, so the plant is sized for the product that pays for it.
Frequently Asked Questions
How many block products should a new plant start with?
Can one block machine produce hollow blocks and pavers?
Why is output so different between products on the same machine?
Which block size sells best in Syria, Iraq and Jordan?
How do I test a product before buying the mould?
Does the product mix change how many pallets I need?
Related machines

Concrete Block Making Machine
Core machine for hollow blocks, solid blocks, pavers and curbstones.

Automatic Block Making Machine
High-output automatic block machine for industrial production lines.

Hydraulic Block Making Machine
Hydraulic forming system for stable density and consistent blocks.

Hollow Block Making Machine
Machine configurations for common hollow concrete block sizes.